Bacon Island Swing Bridge

Write a Review
California United States
37° 57' 20.16'', -121° 31' 33.6''
Bacon Island Swing BridgeBacon Island Swing BridgeBacon Island Swing Bridge
Clear throughout the day.
56℉SW at 4 knots
Low04:37AM1.108ft
High09:56AM3.633ft
Low05:22PM-0.307ft
High11:58PM3.469ft

About


Introduction:

Bacon Island Swing Bridge, some 13 miles west of Stockton, carries traffic across the Middle River from the west levee road on Middle River to Bacon Island Road.


Navigating the Bridge:

Use NOAA Chart 18661.

Characteristics: The bridge has a closed vertical clearance of eight feet with 90 feet of horizontal clearance in the center span. Water depths average 24 feet at mean low water.


Bridge Schedule:

Summer: 9 a.m. to 5 p.m. from May 15 to September 15, the bridge opens with 12 hours advance notice.

Winter: 9 a.m. to 5 p.m. from September 16 to May 14, the bridge opens with 12 hours advance notice.

The bridgetender can be contacted via phone at 209-942-5441.


Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.



No reviews yet! Be the first to write a review of Bacon Island Swing Bridge.