Georgiana Slough Bridge

Write a Review
California United States
38° 14' 12.84'', -121° 31' 4.79''
Walnut Grove
Georgiana Slough Bridge
Georgiana Slough Bridge
Georgiana Slough Bridge
You might also consider...

Metered Electric will be charged in addition to the dockage rate and billed a... Read More


Completely rebuilt in 1994 the Suisun City Marina provides 160 rental berthin... Read More

Details


Closed vertical clearance14

About


Introduction:

Located just south of Walnut Grove. Georgiana Slough breaks off the Sacramento River toward the south and is crossed by a small bridge linking the levee roads on either side.

Navigating the Bridge:

Use NOAA Chart 18662.

Characteristics: The bridge has a closed vertical clearance of 14 feet and 80 feet of horizontal clearance at the center span.

Bridge Schedule:

The bridge operates on a restricted schedule. May 1 to October 31, from 6 a.m. to 10 p.m. and also November 1 through April 30, from 9 a.m. to 5.p.m. the bridge opens on demand. The bridgetender can be hailed on VHF Channel 09.

Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.


No reviews yet! Be the first to write a review of Georgiana Slough Bridge.