Alert forCOVID-19

Georgiana Slough Bridge

Write a Review
California United States
38° 14' 12.84'', -121° 31' 4.79''
Walnut Grove
Georgiana Slough Bridge
Georgiana Slough Bridge
Georgiana Slough Bridge
Clear throughout the day.
64℉W at 10 knots
Low02:04AM0.630ft
High07:24AM3.376ft
Low03:12PM0.135ft
High08:37PM2.650ft
You might also consider...

5 Reviews
Half Moon Marina is a 180-slip marina located on Shelter Island in a beautifu... Read More

Experience The Marina at Dana Point located in South Orange County, midway be... Read More

Gracing the southern portion of explorer Juan Rodriquez Cabrillo’s discovery,... Read More

Details


Closed vertical clearance14

About


Introduction:

Located just south of Walnut Grove. Georgiana Slough breaks off the Sacramento River toward the south and is crossed by a small bridge linking the levee roads on either side.

Navigating the Bridge:

Use NOAA Chart 18662.

Characteristics: The bridge has a closed vertical clearance of 14 feet and 80 feet of horizontal clearance at the center span.

Bridge Schedule:

The bridge operates on a restricted schedule. May 1 to October 31, from 6 a.m. to 10 p.m. and also November 1 through April 30, from 9 a.m. to 5.p.m. the bridge opens on demand. The bridgetender can be hailed on VHF Channel 09.

Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.


No reviews yet! Be the first to write a review of Georgiana Slough Bridge.