Connection Sough Swing Bridge

Write a Review
California United States
38° 0' 15.12'', -121° 31' 55.19''
Connection Sough Swing Bridge
Connection Sough Swing Bridge
Connection Sough Swing Bridge
Clear throughout the day.
52℉WSW at 4 knots
Low02:24AM0.719ft
High07:56AM3.367ft
Low02:47PM0.133ft
High08:56PM3.280ft
You might also consider...

Our Galveston marina is a wonderful place to dock your boat while you visit M... Read More


Please Note: 2-3 night minimum may be charged for special events of holidays.... Read More

About


Introduction:

Connection Slough is located between submerged Mildred Island and Mandeville Island to the east.

Navigating the Bridge:

Use NOAA Chart 18661.

Characteristics: The Connection Slough Swing Bridge has a closed vertical clearance of seven feet and 95 feet of horizontal clearance at the center span. Water depths in Connection slough range from five to 24 feet.

Bridge Schedule:

This bridge operates on a restricted opening schedule.

Summer: The bridge is monitored by a bridgetender from 6 a.m. to 10 p.m. daily, May 1 through Oct. 31.

Winter: The bridge is monitored by a bridgetender from 9 a.m. to 5 p.m. daily, Nov. 1 through April 30.

Four hours advance notice is required from 6 a.m. to 6 p.m.

Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.


No reviews yet! Be the first to write a review of Connection Sough Swing Bridge.