Connection Sough Swing Bridge

Write a Review
California United States
38° 0' 15.12'', -121° 31' 55.19''
Korths Harbor
Connection Sough Swing Bridge
Connection Sough Swing Bridge
Connection Sough Swing Bridge
You might also consider...

1 Review

Metered Electric will be charged in addition to the dockage rate and billed a... Read More

Big Break Marina, nestled along the picturesque waters of the delta, invites ... Read More

Details


Closed vertical clearance7

About


Introduction:

Connection Slough is located between submerged Mildred Island and Mandeville Island to the east.

Navigating the Bridge:

Use NOAA Chart 18661.

Characteristics: The Connection Slough Swing Bridge has a closed vertical clearance of seven feet and 95 feet of horizontal clearance at the center span. Water depths in Connection slough range from five to 24 feet.

Bridge Schedule:

This bridge operates on a restricted opening schedule.

Summer: The bridge is monitored by a bridgetender from 6 a.m. to 10 p.m. daily, May 1 through Oct. 31.

Winter: The bridge is monitored by a bridgetender from 9 a.m. to 5 p.m. daily, Nov. 1 through April 30.

Four hours advance notice is required from 6 a.m. to 6 p.m.

Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.


No reviews yet! Be the first to write a review of Connection Sough Swing Bridge.