Alert forCOVID-19

Belleair Causeway Bridge

Write a Review
Florida United States
27° 55' 0.12'', -82° 49' 54.85''
Clearwater
Belleair Causeway Bridge
Belleair Causeway Bridge
Belleair Causeway Bridge
Belleair Causeway Bridge
Humid and partly cloudy throughout the day.
65℉E at 9 knots
Low04:59AM0.183ft
High11:18AM2.056ft
Low05:13PM0.596ft
High11:11PM2.357ft
You might also consider...

The Town of Fort Myers Beach proudly operates and maintains the Matanzas Harb... Read More

The marina is located in historic downtown Fort Myers. Many restaurants and h... Read More

Slip into the New Smyrna Beach City Marina. The harbor and marina are close t... Read More

Details


Bridge typeFixed
Closed vertical clearance74'

About


Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.

Introduction:

Belleair Causeway Fast Facts Originally opened as low level two-lane drawbridge in 1950 Tolls were collected until sometime in the late 1970's Replaced by high level two-lane bridge in 2009; new bridge opened in 2010 Highway carried: West Bay Drive/Causeway Blvd., as Pinellas County Road 416 Locale: Belleair Beach-Belleair Bluffs


No reviews yet! Be the first to write a review of Belleair Causeway Bridge.