Norwalk, Connecticut United States | |
41° 6' 1.6'', -73° 24' 55.0'' | |
Sheffield Harbor |
Bridge type | Swing |
Closed vertical clearance | 16' |
Vhf | 13 |
Schedule | The bridge will open on signal from 9 AM-5 PM except, Monday through Friday, from 7 AM-8:45 AM and 4 PM-6 PM, the draw will not be opened. The bridge will only open once in any 60-minute period from 5:45 AM-7 AM and 6 PM-7:45 PM. A 4 hour notice must be given between 9 PM-4 AM and there may be up to a 20 minute delay if a train is approaching. |