Reddington Shores (Park Boulevard) Bascule Bridge

Write a Review
Saint Petersburg, Florida United States
27° 50' 36.96'', -82° 50' 17.15''
ration.butter.minstrel
Indian Rocks Beach
Reddington Shores (Park Boulevard) Bascule Bridge
Reddington Shores (Park Boulevard) Bascule Bridge
Reddington Shores (Park Boulevard) Bascule Bridge
Partly cloudy starting later this afternoon, continuing until this evening.
81℉SE at 7 knots
Low05:39AM0.547ft
High11:33AM2.321ft
Low06:01PM0.402ft
You might also consider...

The marina is located in historic downtown Fort Myers. Many restaurants and h... Read More

The Fort Pierce City Marina features a state of the art dock system, located ... Read More

Details


Bridge typeBascule
Closed vertical clearance20'
Vhf9
ScheduleOpens on request.

About


Introduction:

Located at GIWW Mile 126.6, the Reddington Shores Bascule Bridge is the southernmost of two bridges that cross The Narrows near Saint Petersburg.

Navigating the Bridge:

Use NOAA Chart 11411.

The bridge has a closed vertical clearance of 20 feet with 90 feet of horizontal clearance in the center span. Navigating The Narrows is fairly straightforward, but be sure to closely honor all marks. This part of the GIWW not only has soft, sandy shoals, but rock outcrops as well. Currents are generally mild.

Bridge Schedule:

This bridge opens on demand.

The bridge can be opened by horn signal (one long, one short) or by hailing the bridge tender on VHF Channel 09. (All bridges in the state of Florida must be hailed on VHF Channel 09.)

Local Notices to Mariners:

Local Notices to Mariners are available online from the U.S. Coast Guard.


No reviews yet! Be the first to write a review of Reddington Shores (Park Boulevard) Bascule Bridge.